Abstract
Anaerobic on-site treatment of black water (BW) and a mixture of black water and kitchen waste (BWKW) was studied in a two-phased upflow anaerobic sludge blanket septic tank (UASBst) at 10-20 °C. The processes were fed either continuously or discontinuously (twice per weekday). Moreover, BWKW was post-treated for nitrogen removal in an intermittently aerated moving bed biofilm reactor (MBBR) at 20 °C. Removal of total chemical oxygen demand (COD1) was efficient at minimum 90% with all three UASBst at all temperatures. Removal of dissolved COD (CODdis) was also high at approx. 70% with continuously fed BW and discontinuously fed BWKW, while with discontinuous BW feeding it was 20%. Temperature decrease had little effect on COD removals, though the need for phase 2 increased with decreasing temperature, especially with BWKW. Post-treatment of BWKW in MBBR resulted in approx. 50% nitrogen removal, but suffered from lack of carbon for denitrification. With carbon addition, removal of ca. 83% was achieved.
Original language | English |
---|---|
Pages (from-to) | 143-149 |
Number of pages | 7 |
Journal | Water Science and Technology |
Volume | 54 |
Issue number | 2 |
DOIs | |
Publication status | Published - 2006 |
Externally published | Yes |
Publication type | A1 Journal article-refereed |
Keywords
- Anaerobic wastewater treatment
- Black water
- Kitchen waste
- Low temperature
- Moving bed biofilm reactor
- Nitrogen removal
- UASB-septic tank
ASJC Scopus subject areas
- Water Science and Technology