Abstract
Optimal scheduling of the copper smelting process is of great concern in the process industry due to the contradictory objectives of the process units and the presence of inter-dependencies between them. This in combination with commercial interests such as maximizing input concentrates to the Flash Smelting Furnace (FSF), continuous operation of the FSF, and production of the blister copper batches with a shorter batch time hinders the development of a scheduling algorithm based on linear optimization techniques. In this study, a hierarchical scheduling framework is developed that finds feasible schedules for the copper smelting process by solving process inter-dependencies using heuristics. For addressing the FSF inter-dependencies, this framework sees the FSF matte as a scarce resource, and the coordinator uses price-based heuristics for the optimal allocation of the matte to various Peirce-Smith converters. Two case studies are presented to demonstrate the effectiveness of the framework.
| Original language | English |
|---|---|
| Article number | 108198 |
| Journal | Computers and Chemical Engineering |
| Volume | 173 |
| DOIs | |
| Publication status | Published - May 2023 |
| Publication type | A1 Journal article-refereed |
Keywords
- Coordination
- Copper smelting
- Hierarchical framework
- Large-scale process
- Price-based heuristics
- Scheduling
Publication forum classification
- Publication forum level 2
ASJC Scopus subject areas
- General Chemical Engineering
- Computer Science Applications
Fingerprint
Dive into the research topics of 'Coordination strategy based on hard-heuristics and price-updating scheme for copper smelting process'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver