Abstract
We noticed that the Figures 2 and 3 have become the same in the final version of this paper [1]. Therefore, the authors wish to make the following correction. 1. Change in Figure The authors wish to replace Figure 3 as follows: Current Figure 3. The authors would like to apologize for any inconvenience caused to the readers by these changes.The changes do not affect other scientific results and conclusions. The manuscript will be updated, and the original will remain available. A link to this correction will be added.
Original language | English |
---|---|
Article number | 90 |
Journal | Buildings |
Volume | 10 |
Issue number | 5 |
DOIs |
|
Publication status | Published - 9 May 2020 |
Publication type | Not Eligible |
ASJC Scopus subject areas
- Civil and Structural Engineering
- Architecture
- Building and Construction