Abstract
Full scale test structures were constructed in sumemr 1996 to the Ämmässuo landfill to gather experience on quality control during the constructionand long term behviour of mineral liner and combination liners. Actual leachate was used to create the chemical loading and a hydraulic pressure of one meter. The leachate was implemented in October 1996, and the structures were monitored for two years. The structures were continously monitored by temperature and soil moisture sensors installed into the liner. The leachate seeping through the line structure was colledted to the lysimeter basins and further to the lusimeter wells, in which the amount of the water was measured automatically by pressure sensors. In addition, frost penetration and infiltrometer measurements were performed and samples were taken for laboratory tests during the two-year period. The structures were pulled down under control in November 1998.
Original language | English |
---|---|
Title of host publication | Sardinia 99, Seventh International Waste Management and Landfill Symposium, 4-8 October, S. Margherita di Pula, Cagliari, Sardinia, Italy. Proceedings, Vol. I-V. |
Editors | Thomas H. Christensen, Raffaello Cossu, Rainer Stegmann |
Pages | 173-180 |
Number of pages | 8 |
Volume | III |
Publication status | Published - Oct 1999 |
Externally published | Yes |
Publication type | B3 Article in conference proceedings |
Event | Seventh International Waste Management and Landfill Symposium - S. Margherita di Pula, Cagliari, Sardinia, Cagliari, Italy Duration: 4 Oct 1999 → 8 Oct 1999 |
Conference
Conference | Seventh International Waste Management and Landfill Symposium |
---|---|
Country/Territory | Italy |
City | Cagliari |
Period | 4/10/99 → 8/10/99 |
Keywords
- Landfill