Kaivokorttiprosessin optimointi

Translated title of the contribution: Optimization of the Manhole Card Process

Eemeli Pesonen, Marja Palmroth, Annina Takala

Research output: Contribution to journalArticleProfessional

16 Downloads (Pure)

Abstract

Uniquely designed and manufactured manholes connect pipes to the sewer line, branching the sewer line and change direction of the line. Interviews were conducted to find out the steps of manhole card process and to examine problems and needs of the different parties (client, designer, contractor and manhole manufacturer). Errors in the manhole process can cause delays throughout the process. Normally, manhole manufacturers used pdf-file manhole card for each manhole. We propose table formatted manhole cards to replace existing cards to reduce errors in manhole card process.
Translated title of the contribution Optimization of the Manhole Card Process
Original languageFinnish
Pages (from-to)40-43
JournalVesitalous
VolumeLXV
Issue number3
Publication statusPublished - 15 May 2024
Publication typeD1 Article in a trade journal

Fingerprint

Dive into the research topics of 'Optimization of the Manhole Card Process'. Together they form a unique fingerprint.

Cite this