Valutazione della qualità del cronoprogramma per il construction project management

Translated title of the contribution: Schedule quality evaluation for construction project management

Marco Alvise Bragadin, Kalle Kähkönen

Research output: Contribution to journalArticleScientificpeer-review

48 Downloads (Pure)

Abstract

The construction schedule is the most important construction document as it indicates total project duration, project stages and times of activities, costs, logical sequences, quality and safety. Hence, the quality of a phase schedule presented by a contractor must be assessed by the owner's consultant either before the commencement of works or during the bidding phase. Only few international standards concerning schedule quality exist, and most of them are not specific for construction. A construction-oriented schedule quality evaluation procedure, based upon a set of 75 requirements has been proposed. Three different versions of a construction schedule for a case study of a seismic rehabilitation project have been evaluated with the aim of performing the proposed method's proof-of-concept.

Translated title of the contributionSchedule quality evaluation for construction project management
Original languageItalian
Pages (from-to)175-183
Number of pages9
JournalTECHNE
Volume20
DOIs
Publication statusPublished - 2020
Publication typeA1 Journal article-refereed

Keywords

  • Construction
  • Construction planning
  • Project management
  • Project schedule
  • Quality

Publication forum classification

  • Publication forum level 0

ASJC Scopus subject areas

  • Health(social science)
  • Architecture
  • Building and Construction
  • Education

Fingerprint

Dive into the research topics of 'Schedule quality evaluation for construction project management'. Together they form a unique fingerprint.

Cite this