Abstrakti
Optimal scheduling of copper smelting process is an ongoing challenge due to conflicting objectives of the various process units and the inter-dependencies that exist among these units. To design a scheduling framework, two potential alternatives – centralized and hierarchical approaches – can address those inter-dependencies in this process. These approaches represent the two extremes and the choice depends on the accuracy, reliability, and complexity of the scheduling task. In this study, optimization-based centralized and hierarchical scheduling frameworks are developed to find an optimal schedule for the smelting process, considering the inter-dependencies among process units. We propose a practical and effective coordination scheme for the hierarchical framework that finds a near-optimal schedule with reasonable computational demands. Two case studies are presented to demonstrate that the proposed hierarchical framework is capable of finding a near plant-wide optimum for the copper smelting process and it can be used in similar plant-wide scheduling applications.
| Alkuperäiskieli | Englanti |
|---|---|
| Artikkeli | 107864 |
| Julkaisu | Computers and Chemical Engineering |
| Vuosikerta | 164 |
| DOI - pysyväislinkit | |
| Tila | Julkaistu - elok. 2022 |
| OKM-julkaisutyyppi | A1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä |
Rahoitus
Hussain Ahmed reports was provided by EU Framework Programme for Research and Innovation Research Infrastructures and E-Infrastructures.
Julkaisufoorumi-taso
- Jufo-taso 2
!!ASJC Scopus subject areas
- Yleinen kemian tekniikka
- Computer Science Applications
Sormenjälki
Sukella tutkimusaiheisiin 'Centralized and hierarchical scheduling frameworks for copper smelting process'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.Siteeraa tätä
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver