Siirry päänavigointiin Siirry hakuun Siirry pääsisältöön

Characterizing optimal LPWAN access delay in massive multi-RAT smart grid deployments

  • Radek Mozny
  • , Pavel Masek*
  • , Dmitri Moltchanov
  • , Martin Stusek
  • , Petr Mlynek
  • , Yevgeni Koucheryavy
  • , Jiri Hosek
  • *Tämän työn vastaava kirjoittaja

Tutkimustuotos: ArtikkeliTieteellinenvertaisarvioitu

10 Sitaatiot (Scopus)
39 Lataukset (Pure)

Abstrakti

Massive machine-type communications services penetrating the market, such as smart grids, differ from conventional services characterized by stochastic arrival patterns. Requiring permanent end device (ED) connectivity, control centers poll EDs over regular time intervals, leading to batch message arrivals that affect the mean access delay at the air interface. In addition, the smart grid requires high reliability and network availability that can be achieved by utilizing multiple radio access technologies in EDs. Radio access technologies (RATs), i.e., narrowband internet of things (NB-IoT) and long-term evolution machine type communication (LTE-M), have been identified as promising solutions for these use-cases. This work first reports results of an extensive performance evaluation measurement campaign showing that LTE-M can be considered a preferred option and NB-IoT as a possible backup solution for smart grids. We also show that none of the selected technologies can fully meet the requirements of smart grid use cases. We then develop a theoretical model and corresponding association algorithm for balancing traffic load between two low-power wide area network (LPWAN) technologies to minimize the mean access delay. Our results demonstrate that the optimized usage of multi-RAT EDs considerably increases the number of supported EDs operating in polling-based mode. For 500 EDs utilizing a single LTE-M technology, the mean access delay is over two seconds — contradicting the minimum requirements of smart grid applications. On the other hand, multi-RAT EDs running the developed algorithm increase the service capacity by up to six times (up to 3000 EDs) while still satisfying the two-second latency budget.

AlkuperäiskieliEnglanti
Artikkeli101001
JulkaisuInternet of Things
Vuosikerta25
Varhainen verkossa julkaisun päivämäärä7 jouluk. 2023
DOI - pysyväislinkit
TilaJulkaistu - huhtik. 2024
OKM-julkaisutyyppiA1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä

Rahoitus

Research described in this paper was financed by the Technology Agency of the Czech Republic under grant TN02000067, program National Competence Centre. For the research, the infrastructure of the SIX Center was used. The work of D. Moltchanov and Y. Koucheryavy has been supported by the Business Finland Ultra Scalable Wireless Access (USWA) projects within the CELTIC-NEXT programme.

RahoittajatRahoittajan numero
Business Finland Ultra Scalable Wireless Access
National Competence Centre
USWA
Technology Agency of the Czech RepublicTN02000067

    YK:n kestävän kehityksen tavoitteet

    Tämä tuotos edistää seuraavia kestävän kehityksen tavoitteita:

    1. SDG 7 – Edullinen ja puhdas energia
      SDG 7 – Edullinen ja puhdas energia

    Julkaisufoorumi-taso

    • Jufo-taso 1

    !!ASJC Scopus subject areas

    • Software
    • Computer Science (miscellaneous)
    • Information Systems
    • Engineering (miscellaneous)
    • Hardware and Architecture
    • Computer Science Applications
    • Artificial Intelligence
    • Management of Technology and Innovation

    Sormenjälki

    Sukella tutkimusaiheisiin 'Characterizing optimal LPWAN access delay in massive multi-RAT smart grid deployments'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

    Siteeraa tätä