Coordination strategy based on hard-heuristics and price-updating scheme for copper smelting process

Tutkimustuotos: ArtikkeliTieteellinenvertaisarvioitu

5 Sitaatiot (Scopus)
23 Lataukset (Pure)

Abstrakti

Optimal scheduling of the copper smelting process is of great concern in the process industry due to the contradictory objectives of the process units and the presence of inter-dependencies between them. This in combination with commercial interests such as maximizing input concentrates to the Flash Smelting Furnace (FSF), continuous operation of the FSF, and production of the blister copper batches with a shorter batch time hinders the development of a scheduling algorithm based on linear optimization techniques. In this study, a hierarchical scheduling framework is developed that finds feasible schedules for the copper smelting process by solving process inter-dependencies using heuristics. For addressing the FSF inter-dependencies, this framework sees the FSF matte as a scarce resource, and the coordinator uses price-based heuristics for the optimal allocation of the matte to various Peirce-Smith converters. Two case studies are presented to demonstrate the effectiveness of the framework.

AlkuperäiskieliEnglanti
Artikkeli108198
JulkaisuComputers and Chemical Engineering
Vuosikerta173
DOI - pysyväislinkit
TilaJulkaistu - toukok. 2023
OKM-julkaisutyyppiA1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä

Julkaisufoorumi-taso

  • Jufo-taso 2

!!ASJC Scopus subject areas

  • Yleinen kemian tekniikka
  • Computer Science Applications

Sormenjälki

Sukella tutkimusaiheisiin 'Coordination strategy based on hard-heuristics and price-updating scheme for copper smelting process'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä