Abstrakti
This study examines the impact of transitioning from hourly to 15 -minute metering intervals on peak power estimation, leveraging data from the first rollout of new generation smart meters by a Finnish Distribution System Operator (DSO). The analysis demonstrates that the switch to shorter metering intervals significantly influences peak demand estimates, with increases of up to 74.5 % observed at certain metering points. The study also identifies that many electrical connections, based on 60 -minute measurements, are oversized, as power demand often remains below 50 % of the maximum capacity. Additionally, the research highlights the need for more accurate methods of estimating electrical connection requirements, as the introduction of 15 -minute metering provides deeper insights into short-term power demands. These findings have significant implications for DSOs regarding network planning and tariff design optimization. As more 15 -minute data become available, future studies will refine consumption profiles, contributing to more efficient grid management.
| Alkuperäiskieli | Englanti |
|---|---|
| Otsikko | 2025 21st International Conference on the European Energy Market, EEM 2025 |
| Kustantaja | IEEE |
| Sivumäärä | 6 |
| ISBN (elektroninen) | 979-8-3315-1278-1 |
| ISBN (painettu) | 979-8-3315-1279-8 |
| DOI - pysyväislinkit | |
| Tila | Julkaistu - 2025 |
| OKM-julkaisutyyppi | A4 Artikkeli konferenssijulkaisussa |
| Tapahtuma | International Conference on the European Energy Market - Lisbon, Portugali Kesto: 27 toukok. 2025 → 29 toukok. 2025 |
Julkaisusarja
| Nimi | International Conference on the European Energy Market |
|---|---|
| ISSN (painettu) | 2165-4077 |
| ISSN (elektroninen) | 2165-4093 |
Conference
| Conference | International Conference on the European Energy Market |
|---|---|
| Maa/Alue | Portugali |
| Kaupunki | Lisbon |
| Ajanjakso | 27/05/25 → 29/05/25 |
YK:n kestävän kehityksen tavoitteet
Tämä tuotos edistää seuraavia kestävän kehityksen tavoitteita:
-
SDG 7 – Edullinen ja puhdas energia
Julkaisufoorumi-taso
- Jufo-taso 1
!!ASJC Scopus subject areas
- Marketing
- Energy Engineering and Power Technology
- Fuel Technology
Sormenjälki
Sukella tutkimusaiheisiin 'Impact of 15-Minutes Measurement Interval in Smart Metering on Peak Power Estimation and Network Capacity Planning'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.Siteeraa tätä
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver