Improving project control by combining earned value analysis and automatic data collection

  • Lauri Vuorinen
  • , Rami Sariola

    Tutkimustuotos: KonferenssiartikkeliAmmatillinen

    Abstrakti

    Efficient control is critical for project success. One of the most widely discussed project control methods is earned value analysis (EVM). The accuracy of EVM calculations can be improved by combining it with automatic data collection (ADC). This paper analyzes the possibilities of combining EVM and ADC, and the main benefits and challenges related to that. A literature review was conducted to answer these questions. The study demonstrates how the problems related to the evaluation of activity progress have received surprisingly little research focus, and how ADC could be utilized to improve this area of EVM. The benefits of ADC are also not limited to just EVM; despite the choice of a project control methodology, ADC can be utilized to evaluate project progress in a continuous and more accurate way. Finally, it is demonstrated how even the “ADC-enhanced EVM” doesn’t provide an adequate image of project status alone; EVM has to be combined with other project control methodologies. Based on the literature review, several areas for further research are also proposed.
    AlkuperäiskieliEnglanti
    OtsikkoInternational Research Network in Organizing by Projects Conference 2015
    AlaotsikkoIRNOP
    JulkaisupaikkaLondon, U.K.
    Sivut1
    Sivumäärä17
    TilaJulkaistu - 2015
    OKM-julkaisutyyppiD3 Artikkeli ammatillisessa konferenssijulkaisussa
    TapahtumaINTERNATIONAL RESEARCH NETWORK IN ORGANIZING BY PROJECTS RESEARCH CONFERENCE -
    Kesto: 1 tammik. 1900 → …

    Conference

    ConferenceINTERNATIONAL RESEARCH NETWORK IN ORGANIZING BY PROJECTS RESEARCH CONFERENCE
    Ajanjakso1/01/00 → …

    Sormenjälki

    Sukella tutkimusaiheisiin 'Improving project control by combining earned value analysis and automatic data collection'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

    Siteeraa tätä