Copper losses during the Peirce–Smith converter (PSC) operation is of great concern in the copper smelting process. Two primary objectives of the PSC are to produce blister copper with a shorter batch time and to keep the copper losses at a minimum level. Due to the nature of the process, those two objectives are contradictory to each other. Moreover, actions inside the PSC are subject to several operational constraints that make it difficult to develop a scheduling framework for its optimal operation. In this work, a basic but efficient linear multi-period scheduling framework for the PSC is presented that finds the optimal timings of the PSC operations to keep the copper losses and the batch time at a minimum level. An industrial case study is used to illustrate the effectiveness of the proposed framework. This novel solution can be implemented in other smelting processes and used for the design of an inter-PSC scheduling framework.

AlkuperäiskieliEnglanti
Artikkeli2004
Sivumäärä14
JulkaisuProcesses
Vuosikerta9
Numero11
DOI - pysyväislinkit
TilaJulkaistu - 2021
OKM-julkaisutyyppiA1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä

Rahoitus

Funding: This research is supported by the Horizon 2020—European Union Framework Programme for Research and Innovation (grant agreement no 723661; COCOP; http://www.cocop-spire.eu (accessed on 8 November 2021)).

Julkaisufoorumi-taso

  • Jufo-taso 1

!!ASJC Scopus subject areas

  • Bioengineering
  • Chemical Engineering (miscellaneous)
  • Process Chemistry and Technology

Sormenjälki

Sukella tutkimusaiheisiin 'Optimal scheduling of the peirce–smith converter in the copper smelting process'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä