Takt production monitoring and control in apartment renovation projects

Tutkimustuotos: ArtikkeliScientificvertaisarvioitu

12 Lataukset (Pure)

Abstrakti

Construction production is steered with the help of monitoring task progressions and comparing them to the schedule. Construction monitoring is often imprecise. Especially in takt pro-duction, more detailed and systematic monitoring methods should be pursued. In takt production, production must be monitored frequently to make sure that the production follows the takt sched-ule. However, takt production monitoring methods have not been discussed in literature. In this study, a digital monitoring solution for takt production is developed and tested in a case apartment renovation project in Finland. At first, the production monitoring in the case project was done in paper format. This monitoring form was then developed into a digital monitoring application. The progression of production tasks was entered into the application manually. These entries were then automatically compared with a digital takt schedule. As a result, production status can be analyzed automatically and provide diverse information for the construction foremen. This information can be automatically visualized and used as a detailed status report for site meetings. Gathered information can also be revisited afterwards for development or reclamation purposes, for example.

AlkuperäiskieliEnglanti
Artikkeli92
Sivut1-18
Sivumäärä18
JulkaisuBuildings
Vuosikerta11
Numero3
DOI - pysyväislinkit
TilaJulkaistu - maalisk. 2021
OKM-julkaisutyyppiA1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä

Julkaisufoorumi-taso

  • Jufo-taso 1

!!ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Architecture
  • Building and Construction

Sormenjälki

Sukella tutkimusaiheisiin 'Takt production monitoring and control in apartment renovation projects'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä